Due to the changes to the UL218 requirements for Limited Service Fire Pump Controllers, effective January 1, 2020, all Tornatech Model GPL and GPL+GLU controllers will be manufactured and supplied with the following features:

  • Circuit breaker (disconnection means)
    • Externally operable (flanged disconnect)
    • Continuous rating of 115% of FLC
    • Non-thermal type
    • Instantaneous trip not more than 20 times the FLC
  • Locked rotor protection
    • Between 8 and 20 seconds at locked rotor current
    • Three minutes at a minimum of 300% of FLC
  • Run test solenoid valve

The consequence of these changes requires a change in the size of the enclosure as follows:

Model

Size Prior to Jan. 1 2020

Size after Jan. 1 2020

GPL

20” w x 24” h x 8” d

20” w x 36” h x 12” d

GPL+GLU

40” w x 24” h x 8” d

36” w x 36” h x 12” d

The following limitations still apply:

  • Across the line starting only
  • Horsepower rating of maximum 30HP
  • Can only be installed where acceptable by the authority having jurisdiction Not accepted in FM insured property
  • The controllers will still be available in single phase configuration (220V to 240V – 1ph – 60Hz up to 15HP). However, seismic certification is no longer available.

Submittal Drawings:

Effective immediately, these new products can be included as part of your proposals. The website has been updated with the new submittal packages.

Download PDF version Download PDF version
  • Related categories
  • Pumps

In case you missed it

Siemens Expands Into Fire Safety With Danfoss Buy
Siemens Expands Into Fire Safety With Danfoss Buy

Siemens Smart Infrastructure has agreed to acquire Danfoss Fire Safety, which specializes in fire suppression technology and is a subsidiary of Denmark-based Danfoss Group. The ac...

The Dingell Act's Impact: Practical Benefits For Fire Professionals
The Dingell Act's Impact: Practical Benefits For Fire Professionals

The Dingell Act, signed into law in 2019, has far-reaching implications, including effects on fire management and emergency services. Officially named the John D. Dingell, Jr. Cons...

Prevent Downtime With Teledyne FLIR Thermal Imaging
Prevent Downtime With Teledyne FLIR Thermal Imaging

When production halts unexpectedly, it disrupts the entire supply chain, causing delays in product delivery and potential loss of customer trust. Financially, the costs can be sub...

vfd