Seychelles Fire Industry News
Smart Shooter Ltd. (SMARTSHOOTER), a globally renowned designer, developer, and manufacturer of innovative fire control systems that significantly increase the accuracy and lethality of small arms, will present its SMASH 2000 Plus Fire Control System and SMASH Hopper Light Remote-Controlled Weapon Station (LRCWS) at the DEFEA exhibition in Athens, Greece. Ideal for defense, HLS, maritime patrol, border control, strategic infrastructure protection, and counter-UAS missions, SMASH is a comb...
The Mircom Group of Companies, a global designer, manufacturer, and distributor of life safety products and solutions announced that its fire alarm product data and customized specifications are available through the Product MasterSpec software application utilized by architects, engineers, and design professionals around the globe. Product specifications Mircom’s newly listed product specifications are designed to meet MasterSpec’s highly utilized and respected industry standards....
A section of new perimeter fencing has been installed in order to enhance security at the United Kingdom’s largest airport – Heathrow Airport in London. The new hostile vehicle mitigation (HVM) fence at Heathrow Airport will provide protection against the potential event of a vehicle-borne attack or threat. Renowned UK-based safety barrier supplier, Hardstaff Barriers, worked alongside partner - Fernden Fencing, to install the steel ZoneGuard PLUS HVM system, a combined crash-tested...
To manage fire risks, there needs to be a shift away from detecting and responding to emergencies and instead, a look towards connected technologies to provide a pre-emptive, proactive approach. Fires can be highly devastating, putting people at risk and threatening the lives of the public in surrounding areas – not to mention how destructive they can be in terms of damage to materials and property. A connected approach Fortunately, right now, our world is more connected than ever befor...
The process of ensuring that products available in the fire apparatus marketplace are fully optimized for their intended use and are of the best possible quality is a fulfilling yet tricky one – just ask Bob Albano, the fire and rescue business development manager at Hendrickson. Virtual Fire Apparatus Conference His expertise focuses specifically on working with fire apparatus manufacturers across the country to ensure that their products are designed to meet the demands of the fire &am...
Over the course of the past seven months, UKAS has been building on the early success of the Risk-Based project, working with technical experts and industry stakeholders to tailor it to meet the needs of the Construction Testing customers. The approach has been developed with input from the assessment managers, executive team, and advisory committees and has been designed to: Standardizes and structures considerations to improve the consistency of outcomes for customers. Move away from a on...
The recently launched Kingford Stretch High-Vis Trousers from Leo Workwear comes with many benefits and features, included in these fantastic workwear trousers. This article covers the new high-vis trousers from Leo Workwear and looks at why they’re the highly regarded as the new king of high visibility workwear trousers. Made from Recycled polyester One of the main benefits of investing in a pair of Kingford Stretch High-Vis Trousers is the fact that these trousers are made from Reprev...
Mann McGowan is pleased to announce a partnership with Falcon Acoustics & Passive Fire Solutions Pvt. Ltd, which sees Falcon become distributors of Mann McGowan intumescent fire, acoustic and smoke seals to the construction and passive fire protection industries in India. This partnership brings together a wealth of technical and commercial experience and knowledge from both sides. Fire, smoke and acoustic seals manufacturer Mann McGowan design, manufacture and supply a comprehensive rang...
Viking Electronics’ new website is more powerful than ever with advanced tools for finding the right product for any application. “The new Viking website is a great way for customers to get the information and resources they need to make informed product decisions,” says Mike Busby, Marketing and Sales Manager, Viking Electronics. New website features The new website features a layout focused on functionality. Product categories grouped by application, a tab dedicated to tr...
As the demand for UK housing continues to rise, developers and planning authorities are under increasing pressure to deliver the intended UK Government target of 300,000 new homes per year, by the mid-2020s. The need to build as quickly and as cost effectively as possible, unfortunately often leaves little time to invest in developing a thorough understanding of notoriously Byzantine fire safety standards, increasing the risk of serious, potentially fatal, mistakes. firm understanding of fire...
The Big Bear Professional Firefighters are hosting a blood drive on Tuesday, July 13, 2021, from 10:00 a.m. to 6:00 p.m. at Station 281, located at 41090 Big Bear Boulevard., Big Bear Lake, in the front parking lot. Blood donation The need for blood is constant and ongoing. Each donation of blood can save the lives of three people. Along with this blood drive, the Big Bear Fire Department (BBFD) Helicopter, H285, is in the final stages of preparing to carry blood and plasma products on the air...
Cambridgeshire Fire and Rescue Service has invested in two new turntable ladders to add to the fleet. The new specialist appliances will assist in the Service’s response to incidents involving working at height. Replacing two multi-star aerial appliances, the new high-spec vehicles will be based at Stanground, in the north of the county, and at Cambridge, in the south. Both are a Magirus32L/AS, which have been supplied by Emergency One and are mounted on a Scania chassis, which was chose...
The 50th Baltic Operations (BALTOPS) exercise, the premier maritime-focused exercise in the Baltic Region, took place in the Baltic Sea from June 6 to June 18, 2021. Air and maritime assets from NATO allies and partner nations were involved in the live training events. Training focus areas included maritime interdiction, mine countermeasure and amphibious operations. 50th Baltic Operations (BALTOPS) exercise The exercise enhances flexibility and interoperability among allied and partner natio...
Global safety equipment manufacturer MSA Safety Incorporated announced it has completed its acquisition of Bacharach, Inc. in a transaction valued at $337 million. Based in New Kensington, Bacharach is a pioneer in gas detection technologies used in the heating, ventilation, air conditioning, and refrigeration (HVAC-R) markets, with annual revenue of approximately $70 million. Monitoring, managing refrigerants “We’re very excited to officially welcome Bacharach to the MSA family,&...
LEADER (Grupo Leader), alongside its fire safety equipment distributor, SOMATICO, organized a day of technical tests for a wide range of the company’s firefighting equipment, on the 29th of June, 2021, on its premises in Octeville sur Mer, France. Technical tests day The program day included general presentation of the various ranges of firefighting equipment and BIOEX foam concentrates, including ‘Positive Pressure Ventilators’ workshop - presentation and tests that featured...
Verint®, The Customer Engagement Company™ announced enhancements to Verint Connect, the interactive engagement portal designed to give customers and partners access to the information they need about Verint solutions, services, and training all in one place. Built on its Community application and accessible directly from the Verint Cloud Platform, the enhancements to Verint Connect will enable members to gain even greater value from their solutions. Verint Marketplace...
Royal Berkshire Fire and Rescue Service (RBFRS) is supporting the National Fire Chiefs Council’s cooking safety campaign in July, urging residents to take extra care when cooking at home and when using barbecues in the warm weather. Ian Barks, Central Hub Prevention Manager, said, “Half of all accidental fires in the home start in the kitchen, often because people get distracted by their phone, TV, or by interactions with friends and family. Whatever happens elsewhere in...
Innovative plans to increase the number of fire engines and create specialist fire stations across Merseyside, United Kingdom have been unanimously approved. The plans contained within Merseyside Fire & Rescue Service’s (MFRS) Integrated Risk Management Plan (IRMP) 2021-24, represent a continued optimism for the fire service, after a lengthy period of cuts, which has resulted in the loss of fire stations, fire engines and firefighters. Integrated Risk Management Plan Bold plans put...
Thomas Hilse has been appointed as the new Chief Executive Officer (CEO) of Magirus, the global firefighting equipment business of CNH Industrial. Thomas Hilse succeeds Marc Diening, who after the successful turnaround and sustainable re-positioning of the company, elected to leave the company at personal request, in order to pursue new challenges. New CEO appointed “With Thomas, we appoint a Senior Manager to continue the successful development and further strengthen Magirus’ pos...
The Potter PS40-EX Supervisory Pressure Actuated Switch is designed primarily to detect an increase and/or decrease from normal system pressure in automatic fire sprinkler systems located in hazardous locations. Typical applications are Dry pipe systems, pre-action air/nitrogen supervision, pressure tanks, air supplies, and water supplies. The PS40-EX switch is factory set for 40 PSI (2,8 BAR) normal system pressure. The switch marked with the word LOW is set to operate at a pressure decrease o...
The RD13 Riser (with NPT connectors) is constructed from Listed CPVC products suitable for fire sprinkler services subject to the limitations and installation requirements of Flameguard® CPVC pipe and Spears® CPVC fittings. The RD13 Riser incorporates a VSR-SG flow switch, gauge, and drain/test valve. The VSR-SG flow switch is equipped with a union connection to facilitate the installation and removal of the switch in confined spaces. Unique Features Includes flow switch with union...
As one of the largest school districts in the Pacific Northwest, Portland Public School District is comprised of 78 schools and is responsible for educating more than 49,000 students. A plan was recently enacted to provide updated fire protection systems to school buildings within the district. Many new public education complexes have been constructed across Portland, as well as additions made to existing structures. A unified comprehensive fire alarm system needed to be present in every buildi...
Founded in 1874, Polk County sits in the heart of Willamette Valley within the scenic coastal city of Dallas, Oregon. An epicenter for equality and justice, the Polk County Courthouse desperately needed a fire alarm and fire sprinkler system overhaul to ensure the safety of their property and people. The existing four-story building built in 1899 received a three-story annex addition in 1964 and the Polk County Jail Building in 1999. The 69,000 square foot property houses approximately 175 empl...
Smoke control is essential in redirecting hazardous smoke and fumes in the instance of a building fire. These systems save lives and assets which are otherwise at serious risk from smoke during a fire. Potter V6 Software Potter’s IPA Series fire alarm control panels are being updated with V6 firmware. Among several great enhancements to this industry-leading line, V6 unlocks support for smoke control features. Additionally, existing IPA panels that have been installed can be upgraded to...
LION First Responder PPE, Inc., the largest family-owned manufacturer of first responder protective equipment (PPE) in the United States and Tersus Solutions, founded in 2009 in Denver, CO, with the mission of creating world-class CO2 textile cleantech, have entered into a strategic partnership to open the first fully-verified Independent Service Provider (ISP) to offer CO2 Cleaning to the fire service from its Denver, CO facility with expansion plans shortly. CO2 Cleaning Technology Beginning...
The 2012 Olympic Stadium located in Stratford, London created for the 2012 Olympics and Paralympic games. The stadium hosted the opening and closing ceremonies for each of the two games. The stadium also featured in the majority of the track and field events at the games. The initial construction of the Olympic Stadium began in May 2008 and was completed on time and within budget in March 2011. The development was the biggest project of its type in Europe at that time, along with it being the m...
Nido is a 33-story tower, situated in the heart of the bustling Spitalfields district of London; the tower is the third tallest student dormitory in the world. The building offers a modern student housing development providing 1,200 student beds as well as retail units, office space, residential apartments, and several leisure facilities. Services Covered Fire Alarm Disabled Refuge Disabled Toilet Alarm CCTV Access Control The Challenge Protec was issued with the task of supplying, i...
Construction of Terminal 2 at Dublin Airport began in 2007 and opened in November 2010, the terminal is home to 19 departure gates and sees an average of 15 million passengers annually. Terminal 2 has around 9000 m2 of retail and catering outlets, 58 check-in desks, and provision for self-service and online check-in and baggage drop. Services covered Fire Alarm Aspirating Fire Detection Smoke Damper Control Challenge Consultants ARUP set protec the challenge to design develop, supply,...
Announcing the release of the fire sprinkler industry’s line of intelligent nitrogen generators. With complete automation of the fill and purge process, the IntelliGen™ line of nitrogen generators simplifies the installation process by eliminating ball valves. Additionally, IntelliGen™ generators are web-enabled which allows the user to monitor their systems remotely. The patent-pending IntelliGen™ controller software facilitates every aspect of the nitrogen generators i...
The City of Shelby, Ohio recently upgraded its activated-sludge wastewater treatment plant to double its capacity to 5 MGD, while expanding its capability to treat and disinfect combined high-volume stormwater and wastewater flows generated by wet-weather conditions. The project, designed to upgrade much of the plant from its original equipment installed in 1953, included improvements to headworks, upgrading primary settling tanks and aeration systems, adding a new final clarifier, replacing ch...
Browse fire protection news
Related videos
Effective Commissioning Of REACH Wireless Systems
My Story - Irina Cruse, Apollo Fire Detectors Marketing Director
Anheuser-Busch: Ensuring Heroes Have What They Need
The New Future For Fire Agencies
DownloadThe Eight Key Trends in Fire Detection in 2023
DownloadA Digital Platform to Improve Fire Safety Compliance and Inspections
DownloadOvercoming the Challenges of Fire Safety in the Paper Industry
DownloadCarbon Monoxide: Creeping Killer Caught In The Act
Download