CED Fire Protection News
CED Fire Protection was engaged to carry out the dry fire protection to this 4-level 6,200 sqm self-storage facility, which ran for 11 months; the total build cost was a 7.3 million dollar building located in Williamstown. As part of the work, they installed a Pertronic’s FIP fire indicator panel with BOWS building occupancy system, smoke and heat detection was installed, as well as integrating control to sprinklers, security, and mechanical services.
CED Fire Protection was engaged to carry out the dry fire protection to a state-of-the-art education facility for the Southern Cross Grammar Centauri Building for the senior students, including a large creative art hall built cost a 12.3 million dollar building located in Caroline Springs, designed by Watson’s Young Architects. As part of the work, they installed a Pertronic’s sub fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection was installed, a...
CED Fire Protection were engaged to carry out the dry fire protection to this Ferntree Gully 3 level mixed use apartment building with 6 shops, 18 apartments and basement. As part of their works, they installed the Ampac fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection was installed, as well as integrating control to security and mechanical services.
CED Fire Protection was engaged to carry out the dry fire protection at this Diamond Creek child care facility. As part of their works, they installed a Pertronics fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection was installed, as well as integrating control to security and mechanical services.
CED Fire Protection was engaged to carry out the dry fire protection at the Doncaster 5-level apartment building designed by Clare Hopkins Clarke. As part of the work, they installed an Ampac fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection was installed, as well as integrating control to security and mechanical services.
CED Fire Protection were engaged to carry out the dry fire protection to the Glen Iris 4-level apartment building consisting of 16 high-end apartments with one large basement designed by Ewert Leaf. As part of the work, they installed a Pertronic fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection was installed, as well as integrating control to security and mechanical services.
CED Fire Protection was engaged to carry out the dry fire protection for large modular projects for multiple modular builders. As part of the work, they installed cabling, thermal, and heat detection, including integration to access control and mechanical systems.
CED Fire Protection was engaged to carry out the dry fire protection to this 16-level social housing apartment building, consisting of 151 one and two-bedroom apartments, ground floor and communal space, and basement carpark at a build cost of 61 million. As part of the work, they installed an Ampac FIP fire indicator panel with an emergency warning intercommunication system EWIS, WIP phones, smoke, and heat detection, as well as integrating control to sprinklers, security, and mechanical servi...
CED Fire Protection was engaged to carry out the dry fire protection to this Ringwood 4 level apartment building with 24 apartments and basement. As part of their work, they installed the Ampac fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection was installed, as well as integrating control to security and mechanical services.
CED Fire Protection was engaged to carry out the dry fire protection for the Total Tools Factory Complex, a large retail establishment located in Warrnambool. As part of their works, they installed a fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection was installed, as well as integrating control to security and mechanical services.
CED Fire Protection was engaged to carry out the dry fire protection to the Albert Park 3-level office building. As part of the work, they installed an Ampac fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection was installed, as well as integrating control to security and mechanical services.
CED Fire Protection had been engaged to carry out the dry fire protection to the existing Fawkner based bingo hall, due to an extension plan. Part of CED Fire Protection’s work included installing an Ampac fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection, as well as integrating control to security and mechanical services.
CED Fire Protection was engaged to upgrade the existing fire indicator panel and field devices due to continual false alarms, which was interrupting guests and staff. As part of their works carried out, they installed a new fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection, as well as integrating control to security and mechanical services.
CED Fire Protection were engaged to carry out the dry fire protection for a state-of-the-art education facility for the Southern Cross Grammar Centrauri Building for the senior students, including a large creative arts hall built at a cost of $12.3 million, located in Caroline Springs, Designed by Watson’s Young Architects. Part of CED Fire Protection’s work included installing a Pertronic’s fire indicator panel FIP with BOWS building occupancy system, smoke and heat detection...
Browse fire protection news
The New Future For Fire Agencies
DownloadThe Eight Key Trends in Fire Detection in 2023
DownloadA Digital Platform to Improve Fire Safety Compliance and Inspections
DownloadOvercoming the Challenges of Fire Safety in the Paper Industry
DownloadCarbon Monoxide: Creeping Killer Caught In The Act
Download