Integrating Schedule With Shop Floor Data

Finite capacity scheduling enables users to efficiently manage and maintain a production schedule. It helps with sequencing production orders on machines and work centers and ensures the use of capacities wisely. However, NETRONIC Software GmbH all know that things seldom go as planned. Material arrives later than expected.

Or it is there but cannot be used due to quality issues. A machine breaks. The machine operator figures out that he has to run the machine slower than planned. Just to name a few incidents that can make a well-defined schedule absolute at every moment. 

Related Links
vfd